Stages of the
Stadium . . .The Story So Far.
- 1994 - Grimsby
Borough Council commission a report to identify the best site for
potential relocation of GTFC.
- November 1999
- planning application submitted, along with supporting information
including up-to-date study of appropriate sites, which concluded that
the Great Coates A180 interchange site was the only suitable one.
- January 2000
- submission made by GTFC suggesting allocation of the Great Coates
interchange site in the Local Plan.
- July 2000
- NELC Commission planning inspector Gerald Eve to carry out a
new study of possible sites. It was concluded that the Great Coates
Interchange site was the most suitable.
- December 2000
- NELC resolved to allocate the Great Coates Interchange site in the
Local Plan.
- January 2001
- NELC resolved to approve planning application.
- December 2001
- Government Office for Yorkshire and the Humber decided not to intervene
and to leave decision on application with the local authority.
- April 2002
- Local Plan Inquiry held, including examination of Great Coates Interchange
site and objections of local residents.
- April 2002 -Conoco
revealed as the new stadium sponsor.
- November 2002 - Inspector's
report published recommending the retention of Policy LTC6 (football
stadium relocation in the local plan).
- April 2003 - NELC refuse
planning application because Section 106 - a clause to protect ammenities,
like road networks - was not able to be signed.
- November 2003 - NELC's
Local Plan is adopted including the policy to to relocate the football
stadium to the Great Coates Interchange site.
|